handily networks GmbH - Maintenance Fiber Ring Nuremberg (Hetzner/Noris) – Detalji popravke

Sistem se popravlja

Maintenance Fiber Ring Nuremberg (Hetzner/Noris)

Završeno
Zakazano za January 28, 2025 u 10:00 AM – 10:01 AM

Utiče na

Ажурирања
  • Završeno
    January 28, 2025 u 10:01 AM
    Završeno
    January 28, 2025 u 10:01 AM
    Popravka je uspesno završena
  • U toku
    January 28, 2025 u 10:00 AM
    U toku
    January 28, 2025 u 10:00 AM
    Popravka je sada u toku
  • Planirano
    January 28, 2025 u 10:00 AM
    Planirano
    January 28, 2025 u 10:00 AM

    Our Wavelength Provider will be performing a Fiber Switchover to finish our network buildout. The switch-over is done from the DWDM Equipment side the cutover is around 30 Seconds.